Sheet Metal Parts Structure Parts Stretching Parts Stainless

Product Details
Customization: Available
After-sales Service: Money Back Service Within 30 Days
Warranty: 60 Days

360° Virtual Tour

Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, IATF16949
  • Sheet Metal Parts Structure Parts Stretching Parts Stainless
  • Sheet Metal Parts Structure Parts Stretching Parts Stainless
  • Sheet Metal Parts Structure Parts Stretching Parts Stainless
  • Sheet Metal Parts Structure Parts Stretching Parts Stainless
Find Similar Products

Basic Info.

Model NO.
PX-20230020
Type
Hot Stamping
Processing Type
Shaping Metal
Material
Stainless Steel
Mould
Multistep Progressive Dies
Surface Processing
Electroplating
Fine Blanking
Open
Process
Forming Process
Industry
Metal Stamping Parts
Tolerances
0.01mm
Customized
Customized
Size
Stainless Steel
Transport Package
According to Customers′ Requirement
Specification
100*100
Trademark
NO
Origin
China
HS Code
73269019
Production Capacity
500000 Part

Product Description

1. Raw Material Copper, phosphor copper, Brass, Stainless steel, Aluminum, steel, spring steel, Nickel-Silver... and all different kinds of metal;
2. Surface treatment Gold / Silver /Tin / Nickel / Zinc / Chromium / Copper-plating / Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis / Passivating /Deburring / Polishing / Brush according to ROHS standard;
3. Quotation Please provide the Formal drawings (normally, with DWG/STP/PDF file ), and make notes with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet within 48-72 hours;
4. Prototype & Mould We make the prototypes or molds according to the drawings confirmed by the customers and us! The lead time depends on the structure and qty of parts, Normally, the lead time for prototypes is 3-15 days; the lead time for mold is 10-25 days;
5. Production We will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally, the lead time for production is 5-30 days, the structure of parts is different, and the lead time will be different.
6. Package Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.
Sheet Metal Parts Structure Parts Stretching Parts StainlessSheet Metal Parts Structure Parts Stretching Parts StainlessSheet Metal Parts Structure Parts Stretching Parts StainlessSheet Metal Parts Structure Parts Stretching Parts Stainless

Q: How can I get an offer?
A: Please send us the drawings, quantity, weight and materials of the products.
Q: If we don't have drawings, can you draw them for me?
A: Yes, we can draw your samples and copy them.
Q: What kind of documents can you read?
A: Answer: PDF, IGS, DWG, step, etc...
Q: What is your packing method?
A: We usually pack the goods according to the customer's requirements. For reference: wrapping paper, carton, wooden case, pallet.
Q: When can I get the samples and your main orders?
A: For samples: 30-40 days after the start of mold making. For orders: 35-40 days, the exact time depends on the product.
Q: What are your terms of payment?
A: Order: 30% deposit, 70% payment before shipment.
Q: Where is your company located? Can we visit it?
A: We are in Guangdong, China. You are welcome to visit us at any time.

Please feel free to contact us and we will reply within 24 hours. Product Description
1. Raw Material  Copper, phosphor copper, Brass, Stainless steel, Aluminum, steel, spring steel, Nickel-Silver... and all different kinds of metal;
 
2. Surface treatment  Gold / Silver /Tin / Nickel / Zinc /  Chromium / Copper-plating /  Laser etching/Screen printing/Phosphating (can pass salt spray testing with 160 hours)/Black coating / Painting/ Power coating /Electrophoresis /  Passivating /Deburring /  Polishing /  Brush according to ROHS standard;
 
3. Quotation  Please provide the Formal drawings (normally, with DWG/STP/PDF file ), and make notes with material/QTY/surface treatment and any other requirements, we will provide you the quotation sheet within 48-72 hours;
 
4. Prototype & Mould We make the prototypes or molds according to the drawings confirmed by the customers and us! The lead time depends on the structure and qty of parts, Normally, the lead time for prototypes is 3-15 days; the lead time for mold is 10-25 days;
 
5. Production We will provide samples according to the drawings to customers for approval. Then arrange the production and confirm the delivery date according to the Purchase Order; Normally, the lead time for production is 5-30 days, but the structure of parts is different, and the lead time will be different.
 
6. Package  Plastic bags; Preserving Box; Reel/tape package; Plastic tray; Wood box; Export carton and any other customized package according to the customers' requests.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier